Bid Package 3

Bid Package 3 (CLOSED)

Issue Date:  May 24, 2018

Bid Due Date: July 10, 2018

Bid Package 3 Trades

  • Above Grade Roofing & Waterproofing
  • Access Flooring
  • Acoustic Treatment
  • Acoustic Treatment
  • Acoustical Ceilings
  • Applied Fireproofing
  • Architectural Woodwork
  • Asphalt Paving
  • Coiling Doors & Grilles
  • Communication Utilities
  • Concrete Formwork
  • Concrete Suppliers
  • Doors, Frames & Hardware
  • Electrical
  • Electrical Utilities
  • Electronic Monitoring (BMS, FA, Security, T/D, DAS)
  • Expansion Control Systems (Moat System)
  • Fire Alarm
  • Flashing & Sheet Metal
  • Food Service Equipment
  • Geofoam
  • HVAC
  • HVAC (Above Grade)
  • Incline Wheelchair Lift
  • Interior Glazing
  • Interior Partitions
  • Landscaping & Irrigation
  • Loading Dock Equipment
  • Metal Decking
  • Metal Fabrications (Above Grade)
  • Metal Fabrications (Basement)
  • Metal Fabrications (Building)
  • Metal Fabrications (Site)
  • Multiple Seating
  • Painting & Coating
  • Parking Control Equipment
  • Pavement Markings
  • Place and Finish
  • Plumbing
  • Plumbing (Above Grade)
  • Precast Arch Concrete (Ribbon)
  • Reinforcing Steel
  • Resilient Flooring
  • Security Systems
  • Shotcrete (bldg facade + site walls)
  • Signage
  • Site Concrete
  • Site Concrete (Paving)
  • Site Furnishings
  • Site Furnishings (Precast)
  • Stone Assemblies
  • Tele/Data Communications
  • Tiling
  • Toilet Partitions & Accessories
  • Unit Masonry
  • Void Forms
  • Water Features
  • Wet Utilities
  • Wheelchair Lift
  • Window Treatment
  • Wood Flooring

AWARDED

  • Elevators (Museum) to Thyssen Krupp – Santa Fe Springs, CA
  • Structural Steel to Herrick Corp.  – Stockton, CA

How To Get Involved

The formal procurement period has closed for the Museum’s three bid packages. We encourage all interested parties to contact the Project’s prime subcontractors for potential opportunities with sub-subcontracting, supplying of materials and/or other services.

Please note:  Due to the extensive construction process required for this project, the majority of subcontractors will be unable to make sub-tier commitments until 2019.