Bid Package 3

Bid Package 3 (CLOSED)

Issue Date:  May 24, 2018

Bid Due Date: July 10, 2018

Bid Package 3 Trades

  • Acoustic Treatment
  • Acoustical Ceilings
  • Asphalt Paving
  • Doors, Frames & Hardware
  • Flashing & Sheet Metal
  • Geofoam
  • Interior Glazing
  • Metal Fabrications (Building)
  • Metal Fabrications (Site)
  • Multiple Seating
  • Painting & Coating
  • Parking Control Equipment
  • Pavement Markings
  • Resilient Flooring
  • Signage
  • Site Furnishings
  • Site Furnishings (Precast)
  • Stone Assemblies
  • Tiling
  • Toilet Partitions & Accessories
  • Window Treatment
  • Wood Flooring

 

 

 

 

AWARDED

  • Caissons to Malcolm Drilling – Irwindale, CA
  • Electrical / Electrical Utilities to SASCO – Fullerton, CA
  • Electronic Monitoring (BMS) to Siemens – Cypress, CA
  • Elevators (Museum) to Thyssen Krupp – Santa Fe Springs, CA
  • Expansion Control Systems (Moat System) to Harwood Construction – La Verne, CA
  • Fire Alarm to Siemens – Cypress, CA
  • HVAC to ACCO Engineered Systems, Inc. – Glendale, CA
  • HVAC (Above Grade) to ACCO Engineered Systems, Inc. – Glendale, CA
  • Interior Partitions to Sharpe Interiors – Valencia, CA
  • Landscaping & Irrigation to BrightView and Marina – Anaheim, CA
  • Metal Decking to Anning-Johnson Company – City of Industry, CA
  • Metal Fabrications (Basement) to Washington Iron Works – Gardena, CA
  • Plumbing to Murray Co. – Rancho Dominguez, CA
  • Plumbing (Above Grade) to Murray Co. – Rancho Dominguez, CA
  • Precast Arch Concrete (Ribbon) to KHS&S – Anaheim, CA
  • Reinforcing Steel to CMC Rebar (formerly Gerdau) – San Diego, CA
  • Security Systems to Climatec – Van Nuys, CA
  • Site Concrete & Paving to Shaw & Sons and DV Concrete – Costa Mesa & Sun Valley, CA
  • Structural Steel to Herrick Corp.  – Stockton, CA
  • Tele/Data Communications to SASCO – Fullerton, CA
  • Unit Masonry to Frank Smith Masonry – Pomona, CA
  • Water Features to Outside the Lines – Anaheim, CA
  • Wet Utilities to Murray Company –  Rancho Dominguez, CA

 

 

How To Get Involved

The formal procurement period has closed for the Museum’s three bid packages. We encourage all interested parties to contact the Project’s prime subcontractors for potential opportunities with sub-subcontracting, supplying of materials and/or other services.

Please note:  Due to the extensive construction process required for this project, the majority of subcontractors will be unable to make sub-tier commitments until 2019.